concrete batching plant stop treatment
The concrete mixing station mainly consists of 5 main systems, such as concrete mixing station , material weighing system, material conveying system, material storage system and control system. Haomei mechanical concrete mixing station overload capacity is strong, after shutdown 5S can still overload start, in the ratio of cement and aggregate, the energy saving effect is outstanding, can meet the special requirements of long time, generous amount of production and operation.
Stop treatment of mini concrete batching plant :
After the operation, the mixing drum should be cleaned, the discharging door and the discharging hopper, and the water is washed, and the additional agent and the feeding system are washed simultaneously. The knife blade weighing system, should be clean, and shall ensure the accuracy of weighing.
The freezing season, should be put to the pump, pump, water tank and additional agent in the storage of the tank, and should start the pump and the additional agent pump running for one or two minutes.
When the concrete mixer machine is transferred or stopped, the water tank, the additional agent box, the cement, the sand, the stone storage hopper and the material discharging in the weighing hopper are arranged, and the water tank is cleaned. Transfer, should balance weight lever meter is fixed, the sensor should be unloaded.
The mixer before shutdown, should first uninstall, and then close the switch in order and pipeline. All the cement in the spiral pipe should be transported out, and any material in the pipe shall not be retained.
The mixer full stirring not stop, when the failure or outage should be immediately cut off the power, to lock the switch box, mixing cylinder of concrete clean, and troubleshooting or wait until power is restored.